In Matembwe the works for theater are still going on well. we have been accomplishing the works of tiles and we have been painting and building,roofing and painting a connecting corridor between the theater and the other corridors. however we have been working with the installing aluminium windows, now we have painted inside and outside we are waiting for a while then we will be painting the last coat for finishing the painting works. with regards to the aluminium luckily we have already fixed the windows just as you can see the windows in the attached photos.
We are remained with fixing the doors and the tiles on the connecting corridor with the other parts of the Dispensary and the fixing of some basins and plumbing items for water service. the fixing of the electrical lamps.
we are expecting to finish the building works in a near future, thank very much for your support.
May almighty God bless you all, we remain in touch always.
Fr. Method Msanga
Mavanga Parish Priest






